OM01
Operations
Management
(For
CNM Cases)
Assignment - II
Assignment
Code: 2016OM01A2 Last
Date of Submission: 30th April 2016
Maximum
Marks: 100
Attempt all the questions. All the questions are compulsory and
carry equal marks.
Section-A
1. Explain the concept of aggregate
planning. How do we disaggregate the
aggregate plan?
2. a. What are the basic attributes of
Quality?
b. How
can Control Charts help in controlling the delivery time of home delivery of Pizzas?
3. a. How can we enhance productivity in
Indian Manufacturing and retail sectors?
b. Explain
the concepts of work sampling and time study.
4. a.
Explain the Cycle View of Supply
Chain Management.
What are the major
decisions
to be taken for an effective SCM?
b. Bob
Fero is an operations analyst for Sell-Rite Discount stores of
Washington, D.C. He is currently studying the ordering and stocking
policies at Sell-Rite’s central
warehouse for one of its best-moving items, a child’s toy. An examination of historical supply and
demand data for this item indicated and almost constant lead time (LT) of 10 days, and abundant
production capacity allowed very consistent
production and delivery times. Bob also discovered that the
demand per
day(d) was nearly normally distributed with a mean (d) of 1,250 toys per day with a standard
deviation (σd) of 375
toys per day.
i)
Compute the order point for the
toy if the service level is specified at 90% during lead time.
ii) How much safety stock is provided in
your answer in Part A?
Section-B
Case
study
A company receives parts from suppliers
to be used in its manufacturing departments. The quality control department
must perform two operations when shipments and received: Operation A—draw a
random sample, package, and deliver to testing, and Operation B—test the
materials and issue a disposition report. The time estimates for processing six
shipments through quality control are:
Shipment
|
Operation A (hours)
|
Operation B (hours)
|
1
|
1.3
|
0.9
|
2
|
1.3
|
1.1
|
3
|
0.8
|
1.5
|
4
|
1.6
|
1.4
|
5
|
1.5
|
1.0
|
6
|
1.2
|
1.9
|
5. Case Questions:
a.
Use Johnson’s rule to set the sequence of
processing the shipments through quality control. (Operations need change over
to new jobs at the same time.)
b.
How much total time is required to process the
six shipments through quality control? What is the idle time on each operation
A & B?