assignmentssolution@gmail.com

Get Assignments and Projects prepared by experts at a very nominal fee.

More than 8 years in assisting assignments and projects/dissertation/thesis of MBA,BBA,BCA,MCA,PhD and others-

Contact us at : Email : assignmentssolution@gmail.com

Help for : SMU, IIBM,IMT, NMIMS, NIBM ,KSBM, KAIZAN, ISBM, SYMBIOSIS, NIMS, IGNOU, XAVIER, XIBMS, ISM, PSBM, NSBM, NIRM, ISBM, ISMRC, ICMIND, UPES and many others.

Help in : Assignments, projects, M.Phil,Ph.D disseration & thesis,case studies

Courses,MBA,BBA,PhD,MPhil,EMBA,MIB,DMS,MMS,BMS,GDS etc

Contact us at : Email : assignmentssolution@gmail.com



Tuesday, 2 June 2015

SMU MBA Assignments Spring 2015: Contact us for the answers at assignmentssolution@gmail.com

ASSIGNMENT
DRIVE  SPRING 2015
PROGRAM  MBADS (SEM 4/SEM 6)
MBAFLEX/ MBA (SEM 4)
PGDOMN (SEM 2)
SUBJECT CODE & NAME  OM 0017 – ADVANCED PRODUCTION AND PLANNING
CONTROL (4 CREDITS)
BK ID  B2010
MARKS  60
Q.No  Criteria  Marks  Total Marks
1   What are the different line balancing methods?
A  List the different line balancing methods
Explain the steps involved in each method
1
9 (3 marks for each
method)
10
2   What are the various techniques of costing?
A  List the various techniques of costing
Explain the 6 techniques of costing
1
9(1.5 marks each)
10
3  What are the different approaches to sales and operations planning?
A
List the different approaches to sales and
operations planning
Explain the different approaches to sales and
operations planning
1
9 ( 3 marks each)
10
4  What are the rules for scheduling Kanban production?
A  List rules for scheduling Kanban production
Explain the 6 rules for scheduling Kanban
production
1
9 (1.5 marks each)
10
5
What are factors must be considered while implementing a production planning and
control system?
A  Explain the 4 factors to be considered while  10 (2.5 marks each)  10
implementing a production planning and control
system
6  Mention the reasons why manufacturing organizations choose Excel and Visual Basic
prototype as planning and scheduling tools.
A  List the 8 reasons why manufacturing
organizations choose Excel and Visual Basic
prototype as planning and scheduling tools
10 (1.25 marks each)  10
*A-Answer
Note –Answer all questions. Kindly note that answers for 10 marks questions should be approximately of
400 words. Each question is followed by evaluation scheme.
***********
ASSIGNMENT
DRIVE  SPRING 2015
PROGRAM  MBADS (SEM 4/SEM 6)
MBAFLEX/ MBA (SEM 4)
PGDOMN (SEM 2)
SUBJECT CODE & NAME  OM 0016 – QUALITY MANAGEMENT (4 CREDITS)
BK ID  B2009
MARKS  60
Q.No  Criteria  Marks  Total
Marks
1   Discuss the various dimensions of quality given by Garvin.
A  List and explain the 8 dimensions of quality
given by Garvin
10 (1.25 marks
each)
10
2   What are the benefits of applying ISO standards in you organisation?
Explain the phases in the development of a process oriented QMS (Quality
Management System).
A  List and explain any 6 benefits of applying
ISO standards in you organisation
Describe the 4 phases in the development of
a process oriented QMS
6
4
10
3  What do you understand by Management by Walking around (MBWA), a strategy
that may be adopted by the top management to lead an organisation towards TQM?
A  Describe MBWA concept in your own words.
What is required to be done in MBWA?
What are the barriers in practicing MBWA?
What is the advantage of using MBWA?
2
4
2
2
10
4  What are the major differences between Total Quality Management (TQM) and Six
Sigma?
Explain the steps involved in identifying customer requirements for product
development.
A  List any 5 major differences between Total
Quality Management (TQM) and Six Sigma
Describe the 5 step process involved in
identifying customer requirements for product
development.
5
5
10
5  Write short notes on:
1.  Fault Tree Analysis (FTA)
2.  Failure Mode Effect Analysis (FMEA)
A  1.  Fault Tree Analysis (FTA)
2.  Failure  Mode  Effect  Analysis
(FMEA)
5
5
10
6  Explain the concept of Knowledge Support System (KSS). Explain its types.
A  Define KSS
What are the components of KSS
What criteria should be met for the for the
successful implementation of KSS
What is the scope of KSS
Describe the two types of KSS
1
2
2
1
4
10
*A-Answer
Note –Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.
***********
ASSIGNMENT
DRIVE  SPRING 2015
PROGRAM  MBADS (SEM 4/SEM 6)
MBAFLEX/ MBA (SEM 4)
PGDOMN (SEM 2)
SUBJECT CODE & NAME  OM 0015 – MAINTENANCE MANAGEMENT (4 CREDITS)
BK ID  B2008
MARKS  60
Q.No  Criteria  Marks  Total Marks
1   What are the different techniques of proactive maintenance?
A  List and explain the 8 different techniques of
proactive maintenance
10 (1.25 marks each)  10
2   What are the steps involved in organizing maintenance activities?
A  List and explain the 5 steps involved in
organizing maintenance activities
10 ( 2 marks each)  10
3  Write short notes on:
1.  Maintenance optimisation
2.  Maintenance key performance indicators
3.  Maintenance documentation
A  1.  Maintenance optimisation
2.  Maintenance key performance
indicators
3.  Maintenance documentation
3
3
4
10
4  Explain the factors that must be considered while selecting condition monitoring
techniques in an organisation.
A  List and describe the 5 factors that must be
considered while selecting condition monitoring
techniques in an organisation.
10 (2 marks each)  
5  Suppose you are the head of the maintenance department of your organisation which
preventive maintenance tasks would you perform.
A  List the tasks you would perform in preventive
maintenance
Discuss  the  tasks  you  would  perform  in
preventive maintenance
2
8
10
6  Answer the following questions:
1.  What are the types of maintenance budget?
2.  What are the types of maintenance audits?
3.  Give the important objectives of maintenance benchmarking.
A  Explain the 2 types of maintenance budget
Explain the 2 types of maintenance audit
List the important objectives of maintenance
benchmarking
4 (2 marks each)
4 ( 2 marks each)
2
10
*A-Answer
Note –Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.
***********
ASSIGNMENT
DRIVE  SPRING DRIVE 2015
PROGRAM  MBADS (SEM 4/SEM 6)
MBAFLEX/ MBA (SEM 4)
PGDOMN (SEM 2)
SUBJECT  CODE  &
NAME
OM0018 – TECHNOLOGY MANAGEMENT
BK ID  B1979
CREDIT   4
MARKS  60
Note: Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.
Q.No  Questions  Marks  Total Marks
1  a.  What do you mean by S&T policies of organisations?
b.  What is the role of innovation in S&T?
A  a.  Explaining the science and technology
policies of the organisations
6
10
b.  Explaining the role of creativity and
innovation as the main driving forces
4
2  a.  Write about the changing trends in the industry
b.  Explain the methods for Strategic Analysis and Decision Making
A  a.  Write  about  the  changing  trends  in  the
industry
4  10
b.  Explaining the three methods for strategic
analysis and decision making
6
3  a.  Explain about the concept of strategic planning
b.  Describe the concept of technology maps.
c.  What is technology forecasting?
A  a.  Explaining the concept of strategic
planning
4
10
b.  Describing the concept of technology
maps
4
c.  Briefing on technology forecasting  2
4  What is the impact of the technology change on the following:
a.  Organisational productivity
b.  Quality of work life
A  a.  Impact  of  technology  change  on
Organisational productivity
5  10
b.  Impact of technology change on Quality of
work life
5
5  Demonstrate Global Information System
Demonstration of GIS  10  10
6  Explain the conceptual framework of Management of Technology.
Explaining the conceptual framework  10  10

No comments:

Post a Comment