assignmentssolution@gmail.com

Get Assignments and Projects prepared by experts at a very nominal fee.

More than 8 years in assisting assignments and projects/dissertation/thesis of MBA,BBA,BCA,MCA,PhD and others-

Contact us at : Email : assignmentssolution@gmail.com

Help for : SMU, IIBM,IMT, NMIMS, NIBM ,KSBM, KAIZAN, ISBM, SYMBIOSIS, NIMS, IGNOU, XAVIER, XIBMS, ISM, PSBM, NSBM, NIRM, ISBM, ISMRC, ICMIND, UPES and many others.

Help in : Assignments, projects, M.Phil,Ph.D disseration & thesis,case studies

Courses,MBA,BBA,PhD,MPhil,EMBA,MIB,DMS,MMS,BMS,GDS etc

Contact us at : Email : assignmentssolution@gmail.com



Tuesday, 18 June 2013

IIBM Exam papers: contact us for answers at assignmentssolution@gmail.com



Note:
1.    All questions are compulsory.
2.    Use analytical description where required.
3.    Cite references used if any while proposing solution to any question.

Case 1
HOW GENERAL MOTORS IS COLLABORATING ONLINE

The Problem
Designing a car is a complex and lengthy task. Take, for example, General Motors (GM). Each model created needs to go through a frontal crash test. So the company builds prototypes that cost about one million dollars for each car and tests how they react to frontal crash. GM crashes these cars, …..
All this has translated into profit. Despite the economic show down. GM’s revenues increased more than 6 percent in 2002. while its earnings in the second quarter of 2002 doubled that of 2001.

Questions:

1. Why did it take GM over four years to design a new car?
2. Who collaborated with whom to reduce the time-to-market?
3. How has IT helped to cut the time-to-market? 



Case 2
Intranets: Invest First, Analyze Later?

The traditional approach to information systems projects is to analyze potential costs and benefits before deciding whether to develop the system. However for moderate investments in promising new technologies that could offer major benefits. Organizations may decide to do the financial analyses after the project is over. A number of companies took this latter approach in regard to intranet projects initiated prior to 1997.

Judd’s
Located in Strasburg. ….
appropriate indicator was having new scales representatives meet half their quota. Startup costs were $280,000, average annual expenses were estimated at less than $400,000, and annual savings were projected at over $2.5 million. Barry Demak, director of sales, remarked, “we knew the economic justification…would be strong, but we were surprised the actual numbers were as high as they were.”

Questions:
1. Where and under what circumstances is the “invest first, analyze later” approach appropriate? where and when is it inappropriate? Give specific examples of technologies and other circumstances.
2. How long do you think the “invest first , analyze later” approach will be appropriate for intranet projects? When (and why) will the emphasis shift to traditional project justification approaches? (Or has the shift already occurred?)
3. What are the risks of going into projects that have not received a through financial analysis? How can organization reduce these risks?
4. Based on the numbers provided for Cadence Design System’s intranet project, use a spread sheet to calculate the net present value of the project. Assume a 5-year life for the system.


Case 3
Putting IT to Work at Home Depot   

Home Depot is the world’s largest home-improvement retailer, a global company that is expanding rapidly (about 200 new stories every year). With over 1500 stories (mostly in the United States and Canada, and now expanding to other countries) ….
of the EC-related projects. The structure also consider the skills, strengtyhs, and the weeknesses of the It employees. The company offer both the online and offline training aimed at improving those skills. Home Depot is consistently ranked among the best places to work for IT employees.

Questions:

1. Explain why the team based structure at Home Depot is so successful.
2. The structure means that the SPST reports to both marketing and technology. This is known as a matrix structure. What are the potential advantages and problems?
3. How is collaboration facilitated by IT in this case?
4. Why is the process flow important in this case?




Case 4
Dartmouth College Goes Wireless

Dartmouth College, one of the oldest in United States (founded in 1769), was one of the first to embrace the wireless revolution. Operating and maintain a campuswide information system with wires is very difficult. Since there are 161 buildings with more than 1,000 rooms on campus. In 2000, the college introduced a campuswide wireless network that …
evaluate material presented in class and can vote on a multiple-choice questionnaire relating to the presented material. Tabulated results are shown in seconds, promoting discussions. According to faculty, the system “makes students want to give answers,” thus significantly increasing participation.
•    Faculty and students developed a special voice-over-IP application for PDAs and iPAQs that uses live two-way voice-over-IP chat.

Questions:

1.    In what ways is the Wi-Fi technology changing the Dartmouth students?
2.        Some says that the wireless system will become part of the background of everybody’s life – that the mobile devices are just an afterthought. Explain.
3.        Is the system contributing to improved learning, or just adding entertainment that may reduce the time available for studying? Debate your point of view with students who hold a different opinion.
4.        What are the major benefits of the wireless system over the previous wire line one? Do you think wire line systems will disappear from campus one day? (Do some research on the topic.)